Unit 6 – 2.1 solution

2.1 Answer some questions:

  • How long does it take for the foundation to dry out?
    The foundation will dry out in several weeks.

  • What do you have to do before pouring the concrete?
    Before pouring the concrete you have to use wooden boards to build the form and secure it with braces.

  • Who can help you to determine the depth of the footings and the needed amount of rebars?
    A qualified structural engineer.

Come back


 

Copyright © 2024 HELUZ cihlářský průmysl a.s. Všechna práva vyhrazena.